Using a framing square measure the depth of your door jamb by sliding the square under the newly cut gap until the tool hits the door frame or stud.
Floating floor door frame.
If your flooring runs parallel with the door you ll likely have only one piece of laminate to trim.
Floor joists are typically 2 by 8s 2 by 10s or 2 by 12s.
Cut the door s molding and the jamb behind it while keeping the saw on top of the gauge block.
If there s a gap under your door casing and also a gap between two rooms under a door where two different installations of laminate flooring join you can install t molding to hide both gaps.
But when the last few floorboards of your laminate floor need to be laid under the door jambs or through the door lining or door frame it seems impossible to get them in without.
During the flooring installation laying laminate in a doorway perfectly is not so difficult when you start laying the floor boards at the wall that has the door in it.
A floor s framework is made up mostly of wooden joists that run parallel to one another at regular intervals.
Try not to cut higher than the gauge block or a gap will appear between the flooring and the jamb.
Measure on the inner jamb as well as both sides of the door where the trim is located.