Make certain the current supply is always hot and cannot be turned off with another switch.
Fleck 9500 water softener manual.
To change the length of refill time move the two pins at the end of the second group of holes as required.
Model 9500 econominder general commercial installation checklist water pressure.
1 5abbreviations used assy assembly blfc brine line flow controller bv brine valve cw cold water df down flow distr distribution.
A continuous 110 volt 60 hertz current supply is required.
Location of softener and drain.
Fleck 4650 hot water 5600 valves.
Commercial laboratory water distiller.
Compound is used in the manufacture of fleck.
Sediment carbon and neutralizing filters.
Model 9000 9100 9500 service manual important.
9500 control valve service manual.
Sarasota fl 34240 888 378 9021.
Fleck manuals water softeners control heads set up and repair instructions.
Installer manual fleck 9100 sxt generalities 8 116 ref.
Ideal for 1 1 2 commercial systems requiring flow rates up to 48 gpm.
A minimum of 25 pounds of water pressure is required for the valve to operate effectively.
Should be installed ahead of the water softener.
Fleck 2510 manual and 1500 control valves.
Water softener parts 1511 sarasota center blvd.
Fill in pertinent information on page 3 for future reference.
9000 9100 9500 control valve service manual.
Fleck 9000 9100 9500 service manual 5 changing length of brine tank refill time the second group of holes on the program wheel determines the length of time the water conditioner refills the brine tank 2 minutes per hole.
Mkt im 004 d 12 05 2020 1 4intended use the device is intended for commercial applications use only and it is purpose built for water treatment.
While i did not find an elite water softener manual that exactly matches your photo a water softener control head in several models over a number of years the fleck pentair 6700 was used on several water softeners sold under various brand names including fleck pentair elite hydrotech.
The softener should be located close to a drain.
Salt and water savings by using 100 capacity of the tank in service before switching to the second tank regenerates immediately when needed for continuous soft water regenerates with soft water and keeps system clean for optimum operating efficiency and minimum maintenance.
Fleck 9500 control valves replacement parts brine piston assembly lower 1700 1600 cooper elbow o ring coupling retainer seal kit meter module extended range.
To change the length of refill time move the two pins at the end of the second group of holes as required.