After 3 attempts and 5 months to fix numerous creaks in the floor the installer is now claiming.
Fixing wood flooring to concrete.
Mark the holes in the concrete and wood using a permanent marker first to make sure your holes are precise.
Most professional installers use two methods for attaching the subfloor to the concrete.
Put vapor barrier in place step 3.
Fortunately there are many ways to make the transition from concrete floors and wall frames to wood floors and drywall.
The surface of the concrete must be flat and free of oil grease and dust.
How to repair hardwood flooring step 1.
Nail boards into place step 4.
We had a h w floor installed by the builder on concrete slab.
Concrete must be a minimum of 30 days old.
Always use a moisture bearer which is usually placed between the subfloor and the finished floor.
Sand the boards step 5.
Allow the thinset to completely dry before you seal the.
Treated plywood to the concrete with concrete screws spaced every 16 in.
That s the way h w floors are.
Blow the residual dust out of the concrete hole using a vacuum or syringe blower.
Gluing solid parquet flooring directly to a concrete slab solid parquet hardwood flooring can be glued directly to a concrete slab on grade or above grade with the use of a manufacturer recommended vapor retarder.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Solid parquet should not be installed below grade.
I have my doubts on this and would like to figure out what the expectation for a 5.
Drill completely through the wood and about 1 4 inch 0 64 cm deeper than the screw s length into the concrete.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Clean the concrete surface and apply a thinset compound to all of the low areas until the surface of the concrete pad is smooth and level.